Salem, Oregon / Electrical projects
Find an installer for your charging setup in Salem.
A charger offer is the entry requirement. A general electrical listing alone does not enter this category.
- 1. Find the business’s stated service.
- 2. Match the electrical license class.
- 3. Order the eligible records by review date and count.
What we check: Google listing 15/15 · Oregon CCB 15/15 · Oregon BCD 15/15 · Business website 15/15
| Source | What it shows | Coverage | Source dates |
|---|---|---|---|
| Google listing | Listed contact details, rating, count and review date | 15 / 15 | 2026-11-09 |
| Oregon CCB | Dated license, endorsement, bond and insurance fields | 15 / 15 | 2026-11-08 to 2026-11-09 |
| Oregon BCD | Contractor license class and status | 15 / 15 | 2026-11-09 |
| Business website | Services stated by the business; service quality is not established | 15 / 15 | 2026-11-09 |
Not checked: workmanship, price fairness or first-hand testing.
Mountain Coast Electric
Business website ↗EV charger installation stated by the business · 2026-11-09
Newest review 2026-11-04 · 42 Google ratingsverified against Google listing data ·
Air Stars Heating, AC, Plumbing & Electrical
Business website ↗EV charger installation stated by the business · 2026-11-09
Newest review 2026-11-03 · 823 Google ratingsverified against Google listing data ·
Pacific Power Electric LLC
Business website ↗EV charger installation stated by the business · 2026-11-09
Newest review 2026-10-29 · 146 Google ratingsverified against Google listing data ·
Neutral Point Electric
Business website ↗EV charger installation stated by the business · 2026-11-09
Newest review 2026-10-26 · 5 Google ratingsverified against Google listing data ·
True North Electric LLC
Business website ↗EV charger installation stated by the business · 2026-11-09
Newest review 2025-03-22 · 5 Google ratingsverified against Google listing data ·
Make the estimate specific.
This is a planning checklist, not a diagnosis of your property. Ask the contractor to record these items in the proposed scope.
- The charger model, location and proposed circuit
- The load assessment and any panel work proposed
- The cable route, trenching or wall work included
- Permit handling, inspection and commissioning responsibilities
Ask before you book.
- Will you assess the existing electrical load before recommending equipment?
- Is the charger supplied by me or included in your proposal?
- What could change the price after the site visit?
Price evidence is not available.
We have no comparable, source-backed project price records for this category. We publish no price range. Request a written, itemized estimate for the same scope from each contractor, including exclusions and the change-order process.
Why this list differs from a city ranking.
This list first requires evidence for ev charger installation. Our city publication compares the broader electrical record with its separate five-part score. A high city score cannot replace a missing job offer here.
Read the Salem record-score method or open the city comparison. Both publications belong to Crewsive LLC.